What is a backlog? Examples, priorities and a template
A backlog is an ordered list of work being considered for a product or process. Inclusion is not a delivery promise. A useful backlog explains the need, the expected outcome and the decision that comes next.
Updated: · 3 min read
Backlog vs to do vs sprint backlog
A product backlog contains needs that could improve the product; items near the top usually have more detail. To do is a board state for work the team considers ready to start. A sprint backlog includes selected work, the sprint goal and the plan for delivering it. These are related concepts, not interchangeable labels. An operations team can maintain a backlog without using Scrum or scheduling sprints.
What belongs in a backlog item?
Describe the affected person, their problem and an observable success condition. Record the request source and the person responsible for the next decision. Separate a proposed solution from the underlying need. “Add an Excel button” proposes a solution; “Let operations compare weekly orders outside the system” describes a need worth investigating. Keep uncertain estimates distinct from dates promised to customers. An incomplete item can remain in the backlog if its missing information is explicit.
A worked reporting example
The worksheet describes a fictional team. An incorrect report total comes first because it may undermine current use. A date filter could reduce repeated manual work, but the team first checks example workflows. A color preference waits for evidence of a concrete need. This order is not universal. Reassess impact, urgency, dependencies and uncertainty when circumstances change. Counting requests alone does not establish priority; one blocked critical workflow may deserve attention before several cosmetic preferences.
Run a 25-minute weekly review
Spend five minutes separating obsolete and duplicate requests. Use the next ten minutes to identify missing information for the next few candidates. Reserve five minutes for ordering and five for assigning research owners. End with a decision for each candidate: start, investigate, defer or close with a reason. Reviewing the entire list every week creates overhead. Give older items a separate review date and concentrate the meeting on work likely to be selected soon.
Set up the workflow in Taskending
Create requests in the relevant project and keep uncommitted work in the backlog state. Add the worksheet fields to each description. If research is needed, create a separate owned issue and link it to the request. Move an item to To do when its expected result and acceptance conditions are clear. If your team uses sprints, select work against available capacity. Changing the board state does not automatically communicate a delivery commitment to the customer.
Check whether the backlog is useful
For the top five items, answer “Why now?”, “What is missing?” and “Who makes the next decision?” If an item repeatedly slips, investigate its dependencies, size or uncertainty instead of repeatedly raising priority. A smaller backlog is not automatically better. Clear decisions, fewer duplicates and work that can actually start are more useful indicators. Keep a short reason when closing an obsolete idea so the same request is not repeatedly rediscovered.
Backlog review worksheet
| Need | Impact / evidence | Next decision | Decision owner |
|---|---|---|---|
| Verify report total | Sample total differs from screen | Reproduce the discrepancy | Engineering lead |
| Date-range filter | Repeated weekly manual filtering | Collect two usage examples | Product owner |
| Report color preference | Need not yet established | Defer with review date | Product owner |
| [New need] | [Observation or example] | [Start / investigate / defer] | [Name or role] |
Add acceptance conditions, dependencies and the next review date to each item. The example order is not a delivery commitment.
Download template (.md) ↓Free. No registration needed. Use it in a text editor or an issue description.